Event Type |
UCH # |
Documents |
Due Date |
Results |
ITB |
89-0160 |
Advertisement
ITB – 89-0160 Tower Elevator Cabs Refurbishment
AIA – G704 Sample Form
Bid Bond Form
Bid Price Form
Drug Free Certification
New Vendor Form
Sample Construction Agreement
Specifications
Subcontractor List
Job Walk Attendance – 8.28.18
Addendum 1 – Q&A – 9.12.18 |
10/3/2018
4:00 P.M. |
Results – 10.3.18
10.24.2018: ALL BIDS REJECTED FOR ITB 89-0160 |
RFQ |
89-0165 |
RFQ – Tower Apartment Rental Furnishing |
11/14/2018
COB |
Results |
RFQ |
89-0164 |
RFQ – Window Washing 100 & 200 McAllister
Job Walk Attendance – 11.5.18
Addendum 1 – 11.9.18
OPOS – 200 McAllister
Davit Arm Specs – 200 McAllister |
11/16/2018 COB |
Results |
RFQ |
89-0168 |
RFQ – Tower Gym Fan Replacement |
3/5/2019
COB |
2/20/2019
RFQ Cancelled |
RFP |
89-0169 |
RFP – Campus-wide Physical Inventory
Fixed asset report
Addendum 1 – 3.29.19 |
4/10/2019
4:00 p.m. |
Results |
RFP |
89-0001 |
Student Housing Market & Demand Study
Addendum 1 – Q&A |
5/24/2019
5:00 p.m. |
Results |
ITB |
89-0167 |
200 McAllister Street, First Floor Tenant Improvements
Advertisement
Invitation to Bid
Pre-Bid Conference Notice
Bid Form
List of Subcontractors
Sample Agreement
Drug Free Certification
Bid Bond Form
Plans & Specifications and Project Manuals
Engineer’s Estimate
Pre-Bid Attendees
Addendum #1:
–Q&A
-Sheet S-500
Addendum #2:
-Q&A |
6/20/2019
4:00 p.m. |
Results |
ITB |
89-0175 |
200 McAllister Street, Sixth Floor Audio Visual Equipment and Installation
Notice to Bidders
Invitation to Bid
List of Subcontractors
Sample Agreement
Bid Bond Form
Project Manual
Plans & Specifications
Drug Free Certification
Pre-Bid Attendees
Addendum #1:
–Q&A
–Bid pricing sheet (rev.) .pdf
–Bid pricing sheet (rev) .xls
–Sheet TA-500
|
6/27/2019
4:00 p.m
|
Results |