Bids for 2018-2019

Event Type UCH # Documents Due Date Results
ITB 89-0160

Advertisement

ITB – 89-0160 Tower Elevator Cabs Refurbishment

AIA – G704 Sample Form

Bid Bond Form

Bid Price Form

Drug Free Certification

New Vendor Form

Sample Construction Agreement

Specifications

Subcontractor List

Job Walk Attendance – 8.28.18

Addendum 1 – Q&A – 9.12.18

10/3/2018

4:00 P.M.

Results – 10.3.18

 

10.24.2018:  ALL BIDS REJECTED FOR ITB 89-0160

RFQ 89-0165 RFQ – Tower Apartment Rental Furnishing

11/14/2018

COB

Results
 RFQ 89-0164

RFQ – Window Washing 100 & 200 McAllister

Job Walk Attendance – 11.5.18

Addendum 1 – 11.9.18

OPOS – 200 McAllister

Davit Arm Specs – 200 McAllister

11/16/2018 COB Results
RFQ 89-0168 RFQ – Tower Gym Fan Replacement

3/5/2019

COB

2/20/2019

RFQ Cancelled

RFP 89-0169

RFP – Campus-wide Physical Inventory

Fixed asset report

Addendum 1 – 3.29.19

4/10/2019

4:00 p.m.

Results
RFP 89-0001

Student Housing Market & Demand Study

Addendum 1 – Q&A

5/24/2019

5:00 p.m.

Results
ITB 89-0167

200 McAllister Street, First Floor Tenant Improvements

Advertisement

Invitation to Bid

Pre-Bid Conference Notice

Bid Form

List of Subcontractors

Sample Agreement

Drug Free Certification

Bid Bond Form

Plans & Specifications and Project Manuals

Engineer’s Estimate

Pre-Bid Attendees

Addendum #1:

Q&A

-Sheet S-500

Addendum #2:

-Q&A

6/20/2019

4:00 p.m.

Results
ITB 89-0175

200 McAllister Street, Sixth Floor Audio Visual Equipment and Installation

Notice to Bidders

Invitation to Bid

List of Subcontractors

Sample Agreement

Bid Bond Form

Project Manual

Plans & Specifications

Drug Free Certification

Pre-Bid Attendees

Addendum #1:

Q&A

Bid pricing sheet (rev.) .pdf

Bid pricing sheet (rev) .xls

Sheet TA-500

 

 

6/27/2019

4:00 p.m

 

Results